Skids supply and Installation
- Year: 2017
- Client: Air Product
- Project Type: Supply and Installation of 2 skids includes MIMO
Duration: ~ 1 year
About this Project
Supply and Installation of 2 skids includes MIMO: HPO2 2″ Pressure control & flowmeter Manifold – U501HPN2 Flowmeter Manifold – U732
The Work was included:
- Supply of all tubing materials (tubes, fittings, flanges, gaskets, bolts & nuts) as required for the Ultra High Purity Oxygen (UHP) tubing section.
- Supply, fabrication and installation of the tubing (Approx. 200 meter – 3″- 1/4″ High Purity tubing).
- Design, supply, fabrication and installation of piping support as per AP standards.
- Receipt, safe storage, preservation, handling and transport of free-issue materials – (Approx. 100 Ea).
- Tubing cleanout in accordance with AP procedures.
- Non-destructive testing (radiography, dye penetrant testing, positive material identification) in accordance with AP procedures.
- Pressure testing in accordance with AP procedures.
- Analytical tests include reports.
- Tagging Valves.