Supply and Installation of 2 SKIDs

Supply and Installation of 2 skids includes MIMO

Duration: 1 year

Outcomes

  • Ultra high purity oxygen tubing delivered
  • Compliant piping support design and installation
  • Comprehensive analytical testing provided
WhatsApp Image 2025-07-14 at 07.50.02-min
01

Materials

Supplying Materials for Ultra High Purity Oxygen Tubing

For the Ultra High Purity Oxygen (UHP) tubing section of the project, we took care of the complete supply of tubing materials. This included providing all the necessary tubes, fittings, flanges, gaskets, bolts, and nuts required for the installation.

012
02

Tubing

Efficient Tubing Supply, Fabrication, and Installation

We handled the supply, fabrication, and installation of the tubing for the project, covering approximately 200 meters of 3″ – 1/4″ High Purity tubing. Our skilled professionals carefully executed each step to ensure precise measurements, proper fitting, and secure installation.

WhatsApp Image 2025-07-10 at 07.06.54-min-min
03

Piping Support

Compliant Piping Support Design and Installation

To ensure the stability and integrity of the system, we designed, supplied, fabricated, and installed the required piping support in accordance with AP standards. Our team followed industry guidelines and best practices to create robust support structures that met the specific needs of the project.

003-min
04

Transport

Handled Materials with Care throughout the featured project

We took full responsibility for the receipt, storage, preservation, handling, and transport of all materials. Our experienced team ensured that materials were properly managed and maintained their integrity at every stage of the project.

WhatsApp Image 2025-07-10 at 07.06.51-min-min
05

Cleanout

Clean and Reliable Tubing

We followed strict procedures to conduct a thorough tubing cleanout, ensuring that all tubing used in the project was free from contaminants. By adhering to these procedures, we guaranteed reliable performance and minimized the risk of any issues.

team01
06

Testing

Comprehensive Testing and Quality Assurance

We conducted non-destructive testing using various methods such as radiography, dye penetrant testing, and positive material identification. These rigorous testing procedures were carried out in accordance with established guidelines, ensuring that all systems met the required standards.

industrial-zonethe-equipment-oil-refiningnumber-electric-motors-with-reducers-food-industry-details-distribution-system-modern-brewery-equipment-industrial-tools-2
07

Pressure

Pressure Testing and Analytical Reports

To verify the strength and integrity of the systems, we performed pressure testing in accordance with the applicable procedures. Additionally, we provided comprehensive analytical tests and detailed reports, providing a clear understanding of the performance and quality of the completed project.

WhatsApp Image 2025-07-09 at 13.05.32-min
08

Valves

Precise Valve Tagging

Valves played a crucial role in system functionality and control. We ensured proper identification and organisation by tagging valves, making them easily accessible for maintenance and operation.

More Projects